November 30, 2011 at 10:38 AM

Hydropower Takes Center Stage for AMP

American Municipal Power’s (AMP) run-of-river hydropower development is featured in the November 2011 issue of Power Engineering. MWH is providing Owner’s Engineering services for four projects (Cannelton, Smithland, Meldahl and Willow Island) currently under construction. 

Click here to read the article, which begins on page 184.